150 towns on seven corridors, the solar power they supply, the flood water harvested, the water stored, and the pumped hydro battery. Working figures; every assumption is listed in section 09.
The seven MMA corridors, including corridor 7 from Perth to Port Hedland, plus the spine and spurs.
One every 100 km along the seven corridors, as drawn on MMC-DWG-009-04.
Where the corridors cross, including the Alice Hub, Mount Isa and Kalgoorlie.

| Corridor | Route | Length as drawn | Towns |
|---|---|---|---|
| 1 | Brisbane to Perth | 3,515 km | 30 |
| 2 | Darwin to Adelaide | 2,642 km | 21 |
| 3 | Albury to Karumba | 2,178 km | 18 |
| 4 | Port Hedland to Mackay | 3,174 km | 24 |
| 5 | Derby to Esperance | 1,873 km | 15 |
| 6 | Albany to Port Douglas | 3,529 km | 29 |
| 7 | Perth to Port Hedland | 1,323 km | 13 |
| Seven corridors | 18,234 km | 150 |
Lengths are measured along the corridors as drawn on the plan map, from the national plan file. The 23,200 km programme figure also counts the Melbourne to Brisbane spine and its spurs. No town is drawn within 70 km of a port, a city or another town.
Each town is the centre of its own solar and farmland, built ring by ring.
| Hub size | Outer radius | Solar area a town | 150 towns | Energy a year at 24% |
|---|---|---|---|---|
| Australian hub, 6.7 GW | 9.4 km | 267 km² | 1,000 GW | 2,102 TWh |
| 10.0 GW | 11.5 km | 400 km² | 1,500 GW | 3,154 TWh |
| 15.0 GW | 14.0 km | 600 km² | 2,250 GW | 4,730 TWh |
| 20.0 GW | 16.1 km | 800 km² | 3,000 GW | 6,307 TWh |

| Quantity | Figure | How it is calculated |
|---|---|---|
| Capacity of one town | 6.7 GW | 1,000 GW ÷ 150 towns |
| Solar area of one town | 267 km² | 6.7 GW × 40 km² per GW |
| Energy from one town | 14,016 GWh a year | 6.7 GW × 8,760 hours × 24% |
| Capacity of 150 towns | 1,000 GW | 150 × 6.7 GW |
| Solar area of 150 towns | 40,000 km² | 1,000 GW × 40 km² per GW |
| Energy from 150 towns | 2,102 TWh a year | 1,000 GW × 8,760 hours × 24%; 1,927 TWh at 22%, 2,278 TWh at 26% |
Equal to the output of about 4 towns.
| Quantity | Figure | How it is calculated |
|---|---|---|
| Energy to lift 1 GL by 550 m | 1.50 GWh | 1,000 kg per m³ × 9.81 m/s² × 550 m × 1,000,000 m³ ÷ 3.6 × 10¹² |
| Energy to lift 30,000 GL, no losses | 44,962 GWh a year | 30,000 × 1.50 GWh |
| With pump losses | 52,897 GWh a year | 44,962 ÷ 0.85 |
| Share of the solar output | 2.5% | 52,897 ÷ 2,102,400 GWh |
| Average pump power in the flood months | 12.1 GW | 52,897 GWh ÷ 4,380 hours |
Pipe and channel friction over the length of the corridors is not included, so the pumping energy is a lower figure than the real one.
Stored water is also the battery. Surplus solar pumps it to the upper reservoir by day; it runs back through turbines when power is needed.
One full discharge of the Alice Hub volume at the 400 m average head.
18% of the 16,000 GL. The water is reused each day.
| Quantity | Figure | How it is calculated |
|---|---|---|
| Energy in 1 GL at 400 m | 1.09 GWh | 1,000 × 9.81 × 400 × 1,000,000 ÷ 3.6 × 10¹² |
| Delivered by the turbines | 0.98 GWh per GL | 1.09 × 0.9 |
| 16,000 GL discharged once at 400 m | 15,696 GWh | 16,000 × 0.98 GWh |
| Half a day of output, one town | 19.2 GWh | 14,016 GWh ÷ 365 ÷ 2 |
| Water cycled for one town-night | 19.6 GL | 19.2 ÷ 0.98 GWh per GL |
| Water cycled for 150 towns | 2,936 GL | 150 × 19.6 GL |
| Nights carried by 16,000 GL with no refill | 5.5 | 15,696 ÷ 2,880 GWh a night |
The Alice Hub memo uses an average head of 770 m for its seven gorge pairs and gives about 30,886 GWh usable.3 At 770 m the energy in 16,000 GL is 33,572 GWh before losses. This page uses the 400 m average across all storage locations.
Exports to the Asia-Pacific and data centres need power day and night. This section sizes the case where pumped hydro alone carries the night.
| Solar installed | Equal power, day and night | Night energy | Water cycled a night | Turbine power needed |
|---|---|---|---|---|
| 250 GW | about 51 GW | about 710 GWh | about 730 GL | about 51 GW |
| 500 GW | about 102 GW | about 1,420 GWh | about 1,450 GL | about 102 GW |
| 750 GW | about 153 GW | about 2,140 GWh | about 2,180 GL | about 153 GW |
| 1,000 GW | about 204 GW | about 2,850 GWh | about 2,900 GL | about 204 GW |
| Item | Figure | Basis |
|---|---|---|
| Corridors | 7 | Seven MMA corridors |
| Towns | 150 | One every 100 km |
| Solar capacity | 1,000 GW | 6.7 GW a town; expandable in rings to 20 GW a town (3,000 GW) |
| Solar area | 40,000 km² | 40 km² per GW |
| Solar energy | ~2,102 TWh a year | 24% capacity factor; 7.4 times Australian generation in 2024 |
| Water harvested | 30,000 GL a year | MMA Memo 14 target |
| Energy to lift the water | ~53 TWh a year | 2.5% of the solar energy |
| Water stored | 16,000 GL | Alice Hub, MMA plan; range sites not yet sized |
| Battery, one full discharge | ~15,700 GWh | 400 m head, 90% efficiency |
| Water cycled each night | ~2,900 GL | Half of the daily solar output carried into the night |