The plan · Working figures

Australia: the working plan in numbers

150 towns on seven corridors, the solar power they supply, the flood water harvested, the water stored, and the pumped hydro battery. Working figures; every assumption is listed in section 09.

Corridors, towns and water on one map.

Corridors
7

The seven MMA corridors, including corridor 7 from Perth to Port Hedland, plus the spine and spurs.

Towns
150

One every 100 km along the seven corridors, as drawn on MMC-DWG-009-04.

Intersection cities
7

Where the corridors cross, including the Alice Hub, Mount Isa and Kalgoorlie.

Flood capture
30,000 GL/yr

The MMA target, taken as flood overflow only.1

Map of Australia: the MMA corridors, flood rivers, feeder aqueducts, the Alice Hub and a town every 100 km
Australia: the MMA plan. MMC-DWG-009-04. Rivers, feeders and storage positions are indicative. Not to scale.

The seven corridors

CorridorRouteLength as drawnTowns
1Brisbane to Perth3,515 km30
2Darwin to Adelaide2,642 km21
3Albury to Karumba2,178 km18
4Port Hedland to Mackay3,174 km24
5Derby to Esperance1,873 km15
6Albany to Port Douglas3,529 km29
7Perth to Port Hedland1,323 km13
Seven corridors18,234 km150

Lengths are measured along the corridors as drawn on the plan map, from the national plan file. The 23,200 km programme figure also counts the Melbourne to Brisbane spine and its spurs. No town is drawn within 70 km of a port, a city or another town.

Water →   Phase maps →

Built outward in rings.

Each town is the centre of its own solar and farmland, built ring by ring.

  1. The town, 0 to 2 km. Built around a central square, with the corridor through the centre.
  2. Elevated PV with farming under it, 2 to 4 km. Panels raised about 5 m, so crops and machinery work underneath.
  3. PV at scale, 4 to 8.2 km. The main solar ring.
  4. CSP and wind, 8.2 to 9.4 km. The outer ring.
  5. The Australian hub, 6.7 GW. To reach 1,000 GW from 150 towns, each hub is 6.7 GW, about 267 km² of solar. The MMC standard hub is 5 GW, with its outer ring at 8.2 km.
  6. Expansion outward in rings. Each further ring adds about 5 GW and about 200 km². Towns are 100 km apart, so a 20 GW hub, 32 km across, leaves open country between towns.
Hub sizeOuter radiusSolar area a town150 townsEnergy a year at 24%
Australian hub, 6.7 GW9.4 km267 km²1,000 GW2,102 TWh
10.0 GW11.5 km400 km²1,500 GW3,154 TWh
15.0 GW14.0 km600 km²2,250 GW4,730 TWh
20.0 GW16.1 km800 km²3,000 GW6,307 TWh
The Australian town hub in rings, with expansion rings
The Australian town hub, 6.7 GW, in rings to about 9.4 km, with expansion rings to 10, 15 and 20 GW. East and west, along the corridor, the PV expands ring by ring; north and south, irrigated farmland expands past the PV. Illustrative.

Farming →   Cities →

1,000 GW from 150 towns.

One town
6.7 GW

About 267 km² of solar; about 14,016 GWh a year.A2

150 towns
1,000 GW

About 40,000 km² of solar in total.A1

Energy a year
~2,102 TWh

Range 1,927 to 2,278 TWh at capacity factors of 22 to 26%.2

Against today
7.4 times

Australia generated 283,920 GWh in 2024.4

QuantityFigureHow it is calculated
Capacity of one town6.7 GW1,000 GW ÷ 150 towns
Solar area of one town267 km²6.7 GW × 40 km² per GW
Energy from one town14,016 GWh a year6.7 GW × 8,760 hours × 24%
Capacity of 150 towns1,000 GW150 × 6.7 GW
Solar area of 150 towns40,000 km²1,000 GW × 40 km² per GW
Energy from 150 towns2,102 TWh a year1,000 GW × 8,760 hours × 24%; 1,927 TWh at 22%, 2,278 TWh at 26%

30,000 GL a year, lifted to the centre.

Harvested
30,000 GL/yr

About 12–15% of northern runoff, as flood overflow only.1

Energy to lift it
~53 TWh/yr

To the Alice Hub at about 550 m, at 85% pump efficiency.A4

Share of the solar
2.5%

Equal to the output of about 4 towns.

Pump power
~12 GW

If all pumping is done in the six flood months.A5

QuantityFigureHow it is calculated
Energy to lift 1 GL by 550 m1.50 GWh1,000 kg per m³ × 9.81 m/s² × 550 m × 1,000,000 m³ ÷ 3.6 × 10¹²
Energy to lift 30,000 GL, no losses44,962 GWh a year30,000 × 1.50 GWh
With pump losses52,897 GWh a year44,962 ÷ 0.85
Share of the solar output2.5%52,897 ÷ 2,102,400 GWh
Average pump power in the flood months12.1 GW52,897 GWh ÷ 4,380 hours

Pipe and channel friction over the length of the corridors is not included, so the pumping energy is a lower figure than the real one.

Storage at storage locations, not in each town.

  • The Alice Hub. 16,000 GL across seven gorge pairs in the MacDonnell Ranges, in the MMA plan.3
  • Against the harvest. 16,000 GL is 53% of one year's capture of 30,000 GL, or about 6.4 months of it.
  • Storage in the ranges. Further sites on high ground in the MacDonnell Ranges, the Hamersley Range and the Queensland uplands, each linked to the nearest corridor. Their volumes are not yet sized.
  • Lake Argyle. The existing storage on the Ord, 10,763 GL at full supply, is the first node in the north.1

About 0.98 GWh from every gigalitre at 400 m.

Stored water is also the battery. Surplus solar pumps it to the upper reservoir by day; it runs back through turbines when power is needed.

Per gigalitre
~0.98 GWh

Delivered at 400 m head and 90% generating efficiency.A6

16,000 GL at 400 m
~15,700 GWh

One full discharge of the Alice Hub volume at the 400 m average head.

One night, one town
~20 GL

Cycled to carry half of one town's daily output into the night.A7

One night, 150 towns
~2,900 GL

18% of the 16,000 GL. The water is reused each day.

QuantityFigureHow it is calculated
Energy in 1 GL at 400 m1.09 GWh1,000 × 9.81 × 400 × 1,000,000 ÷ 3.6 × 10¹²
Delivered by the turbines0.98 GWh per GL1.09 × 0.9
16,000 GL discharged once at 400 m15,696 GWh16,000 × 0.98 GWh
Half a day of output, one town19.2 GWh14,016 GWh ÷ 365 ÷ 2
Water cycled for one town-night19.6 GL19.2 ÷ 0.98 GWh per GL
Water cycled for 150 towns2,936 GL150 × 19.6 GL
Nights carried by 16,000 GL with no refill5.515,696 ÷ 2,880 GWh a night
  • Power for 24 hours. Exports to the Asia-Pacific and data centres need power day and night. As the solar is installed towards 1,000 GW, pumped hydro power is increased in step.
  • Other storage alongside. CSP with heat storage and wind in each hub, and batteries. The mix and the sizing are for detailed design.

The Alice Hub memo uses an average head of 770 m for its seven gorge pairs and gives about 30,886 GWh usable.3 At 770 m the energy in 16,000 GL is 33,572 GWh before losses. This page uses the 400 m average across all storage locations.

Storage grows in step with the solar.

Exports to the Asia-Pacific and data centres need power day and night. This section sizes the case where pumped hydro alone carries the night.

Solar installedEqual power, day and nightNight energyWater cycled a nightTurbine power needed
250 GWabout 51 GWabout 710 GWhabout 730 GLabout 51 GW
500 GWabout 102 GWabout 1,420 GWhabout 1,450 GLabout 102 GW
750 GWabout 153 GWabout 2,140 GWhabout 2,180 GLabout 153 GW
1,000 GWabout 204 GWabout 2,850 GWhabout 2,900 GLabout 204 GW
  • How it is calculated. Solar supplies demand directly for 10 hours and storage supplies it for 14 hours, at a 76.5% round trip (85% pumping, 90% generating) and 400 m head. At 1,000 GW: 5,760 GWh a day ÷ (10 + 14 ÷ 0.765) hours = about 204 GW.
  • Against the Alice Hub. The Alice Hub memo has 40 GW of turbines, which matches the first stage, at about 200 GW of solar. Turbine and pump capacity is added at the Alice Hub and the range storage sites as the solar is installed.
  • Energy in store. 16,000 GL at 400 m delivers about 15,700 GWh, about 5.5 nights at the 1,000 GW stage with no sun.
  • Other storage lowers these figures. CSP with heat storage and wind in each hub, and batteries, all reduce the turbine power needed. The mix and the sizing are for detailed design.

The plan in one table.

ItemFigureBasis
Corridors7Seven MMA corridors
Towns150One every 100 km
Solar capacity1,000 GW6.7 GW a town; expandable in rings to 20 GW a town (3,000 GW)
Solar area40,000 km²40 km² per GW
Solar energy~2,102 TWh a year24% capacity factor; 7.4 times Australian generation in 2024
Water harvested30,000 GL a yearMMA Memo 14 target
Energy to lift the water~53 TWh a year2.5% of the solar energy
Water stored16,000 GLAlice Hub, MMA plan; range sites not yet sized
Battery, one full discharge~15,700 GWh400 m head, 90% efficiency
Water cycled each night~2,900 GLHalf of the daily solar output carried into the night

What the figures rest on.

  1. A1. Towns. 150 towns as drawn on MMC-DWG-009-04, each at 6.7 GW so the total is 1,000 GW. The MMC standard hub is 5 GW. Earlier MMA memos state 200 towns at 5 GW; this page carries the current figures.
  2. A2. Solar density and yield. 40 km² per GW and a capacity factor of 22 to 26%, mid 24%, from the MMA solar sizing memo.2 Applied to the whole hub; CSP and wind are not sized separately. The split of the Australian hub into a PV ring to 8.2 km and a CSP and wind ring to 9.4 km is illustrative.
  3. A3. Harvest. 30,000 GL a year, the MMA Memo 14 target.1
  4. A4. Lift. All water is lifted 550 m, from near sea level to the Alice Hub, at 85% pump efficiency. Friction is not included. Inland capture starts higher and needs less lift.
  5. A5. Pumping season. All pumping is done in six months (4,380 hours), November to April.
  6. A6. Pumped hydro. Average head 400 m across the storage locations; 90% generating efficiency. Storage volume 16,000 GL, from the Alice Hub memo.3
  7. A7. Night supply. Half of each day's solar output is stored and delivered at night. The real share depends on demand, wind and CSP.
  1. MMA Memo 14, The Sovereign Aqueduct Network.
  2. MMA memo, Solar sizing.
  3. MMA memo, Alice Hub pumped hydro.
  4. Department of Climate Change, Energy, the Environment and Water, Australian Energy Statistics, Table O, calendar year 2024.