Phase 0-6

Phase 0-6 — Melbourne to Adelaide

A direct corridor between Melbourne and Adelaide, connecting the south-eastern population centres to the network for the first time.

What this route does for you.

This section will describe what the route specifically delivers for the people on or near the line — journeys enabled, towns connected, what changes for everyday life. Audience-specific framing in development.

Where it goes.

Plain-language route description in development. Will describe the corridor alignment, terrain, length, and key engineering features.

Phase 0-6 route map.

Towns and stations along the corridor.

List of communities along the corridor and what each town gains from the connection — in development.

If you board and stay on.

JourneyDistanceMaglevElectric freight
Melbourne → Adelaide665 km1h 10min2h 40min

Direct point-to-point time. Maglev at peak speed, electric freight at peak. No intermediate stops.

Services on the corridor.

Service stack carried by this corridor (passenger maglev, electric freight, HVDC transmission, water, gas, fibre, etc.) — detail in development.

Timing.

Sequencing open. The order of phases beyond Phase 0 will be determined by political and economic momentum, capital partner sequencing, and community advocacy after the Phase 0 spine is operating.

How this route gets built.

Design and engineering detail — pylon configuration, viaduct type, terrain treatment, construction methodology, manufacturing approach. To be developed alongside the dedicated MMC engineering memo for this route.

Phase 0-6 engineering diagram — image to be added

What this route costs.

Cost build-up and funding plan — capital, operating, lifecycle. Detailed cost engineering memo in preparation. Numbers will be published once the analysis is complete and reviewed.

Read the technical study.

A dedicated engineering memo studying this route — alignment analysis, terrain data, traffic projections, cost build-up — is being developed for publication on the Multi-Modal Corridors site. Link will be added when the memo is complete.

One programme. The whole nation, built together.

Read the full plan, see the benefits, and find out how to take action.

Back to the plan → Action →