Phase 0-2

Phase 0-2 — Newcastle to Sydney Central

A passenger-priority corridor from Newcastle CBD to Sydney Central — the 15-minute maglev journey at 600 km/h. About 142 kilometres through the Watagans, Hornsby, and Parramatta into the heart of Sydney.

What this route does for you.

This section will describe what the route specifically delivers for the people on or near the line — journeys enabled, towns connected, what changes for everyday life. Audience-specific framing in development.

Where it goes.

Phase 0-2 runs south from Newcastle CBD through the Watagans range — a ridge-route alignment minimising tunnel content — past Hornsby, through Parramatta, and into Sydney Central. About 142 kilometres. The route uses the MMC-VC single-leg single-deck viaduct configuration optimised for passenger transport at speed.

Phase 0-2 route map.

If you board and stay on.

JourneyDistanceMaglev
Newcastle → Sydney Central142 km15min

Passenger-priority corridor — maglev only. Direct point-to-point time at peak speed (600 km/h sustained). No intermediate stops. Freight stays on the Phase 0 spine.

Towns and stations along the corridor.

Stations: Newcastle CBD, Wyong/Tuggerah, Hornsby, Parramatta, Sydney Central. Hundreds of thousands of commuters in the Newcastle, Central Coast, and northern Sydney corridors gain a high-speed alternative to the current 2.5-hour rail journey or 2-hour road journey.

Services on the corridor.

Passenger maglev priority configuration. MMC-VC single-leg single-deck viaduct. Variable pylon height (6m to 150m+) for the ridge-route terrain through the Watagans.

Timing.

Sequencing open. The order of phases beyond Phase 0 will be determined by political and economic momentum, capital partner sequencing, and community advocacy after the Phase 0 spine is operating.

How this route gets built.

Design and engineering detail — pylon configuration, viaduct type, terrain treatment, construction methodology, manufacturing approach. To be developed alongside the dedicated MMC engineering memo for this route.

Phase 0-2 engineering diagram — image to be added

What this route costs.

Cost build-up and funding plan — capital, operating, lifecycle. Detailed cost engineering memo in preparation. Numbers will be published once the analysis is complete and reviewed.

Read the technical study.

A dedicated engineering memo studying this route — alignment analysis, terrain data, traffic projections, cost build-up — is being developed for publication on the Multi-Modal Corridors site. Link will be added when the memo is complete.